Construction Notice: College Avenue West Lane Restrictions
Work is expected to begin on or about October 23 and last for two days, weather permitting.
We are working with Englobe to conduct a geotechnical investigation on College Avenue West from Scottsdale Drive to Edinburgh Road South.
This investigation is being completed to determine conditions such as soil types, groundwater elevations and other design parameters that need to be understood to complete the detailed design.
Affected Areas
- Traffic lanes: Lane reductions on College Avenue West and Edinburgh Road South around the equipment while it is in operation. Two-way traffic will be maintained at all times.
- Sidewalks: No changes.
- Cycle track: The north cycle track on College Avenue West will be closed. Cyclists to dismount and walk along the sidewalk around the work zone.
- Guelph Transit: Guelph Transit stop ID number 155 will be temporarily impacted while equipment is on site. Please visit guelphtransit.ca for details.
- Waste collection: No changes.
Author's summary: Construction on College Avenue West starts October 23.
more
City of Guelph — 2025-10-15